How a patio cover project works

Six steps, one crew and no surprises about who does what. A free site visit within 24 hours, a written estimate in about 72, and most installs take 1 to 5 days on site.

How does a patio cover project work?

  1. Step 1: Reach out

    Call, text or send the form

  2. Step 2: Site visit

    Within 24 hours, at a time that suits you

  3. Step 3: Written estimate

    Usually within 72 hours, good for 90 days

  4. Step 4: HOA, permit and engineering

    We prepare and file it after you sign

  5. Step 5: Install

    1 to 5 days, by our own crew

  6. Step 6: Walk-through

    We check it with you and clean up

Ken is available to you throughout the project for updates, questions and concerns.

Step by step

What happens at each step, how long it takes, and who does what.

  1. Reach out

    Today

    Call, text or send the form with a little about your patio. We reply within one business day.

    What you do
    Tell us roughly what you have in mind and where you live. Photos help but aren't required.
    What we do
    Reply by call or text and set up your free site visit.
  2. Free site visit

    Scheduled within 24 hours

    We schedule your free, in-person site visit within 24 hours and come out at a time that suits you. We measure the patio and talk through how you want to use it.

    What you do
    Show us the space and tell us how you'll use it: shade, dining, the pool, the view.
    What we do
    Measure, check the setbacks and where the sun hits, and walk you through the cover types, roofs and materials.
  3. Written estimate

    Usually within 72 hours

    You get a written estimate, usually within 72 hours of the visit. It's good for 90 days, so there's no pressure to decide on the spot.

    What you do
    Look it over, ask questions and decide when you're ready.
    What we do
    Spell out the cover, the size and the materials in writing.
  4. HOA, permit and engineering

    After you sign

    Once you sign, we handle the paperwork: the HOA packet, the building permit (we pull one on every job) and the engineering, through a third-party engineering company.

    What you do
    Sign the HOA form if your association asks for the owner's signature.
    What we do
    Prepare the HOA packet with drawings, answers to common questions and brochures, file the permit, and get the engineering done.
  5. Install

    1 to 5 days on site

    Our own crew builds your cover, usually in 1 to 5 days on site depending on the project. No subcontractors.

    What you do
    Nothing. Go about your day.
    What we do
    Dig the footings, set the posts and build the cover, cleaning up as we go.
  6. Walk-through and cleanup

    The last day

    When it's done, we walk through the finished cover with you and clean up. Ken is available to you for updates, questions and concerns from the first call to this moment.

    What you do
    Walk it with us and tell us if anything isn't right.
    What we do
    Check every detail with you and leave the site clean.

What's included in your free estimate?

A free, in-person site visit within 24 hours, then a written estimate, usually within 72 hours and good for 90 days.

  1. We measure and talk it through

    At your home, at a time that suits you

  2. Your estimate in writing

    Usually within 72 hours, good for 90 days

  3. Permit, HOA packet and engineering

    We prepare and file it all after you sign

  4. Built by our own crew

    1 to 5 days on site, then a walk-through and cleanup

Ask about our military and senior discounts.

Freestanding insulated Alumawood/Elitewood cover over an outdoor kitchen, built by Celebrity Patios

Lifetime warranty

on our workmanship. Materials are covered by the manufacturer.

What can change the timeline

The build itself is quick. Most of the waiting is the approvals, and we handle all of it.

  • Your HOA's review

    If you have an HOA, its review usually comes first, and each sets its own timing. Summerlin North's association, for example, has up to 30 business days to respond, and Southern Highlands says standard reviews take up to 45 calendar days. We prepare a complete packet so it isn't sent back.

  • The permit office

    Your city or Clark County reviews the permit before we build. Review times vary by office and by how busy they are. We file it as soon as you sign and the HOA approves.

  • Engineering

    Larger and custom covers, like long cantilevers, get site-specific engineering. We handle it through a third-party engineering company as part of the permit.

  • The size of the project

    Once we start, most covers take 1 to 5 days on site. Bigger covers, combo roofs and covers around pools or outdoor kitchens sit at the longer end.

Live in Summerlin, Henderson or an HOA community? See the permit and HOA notes for your area.

What the process is like

Read all reviews
  • “Our neighbor recommended this company to do our backyard patio and we're happy we called Ken. He came out the next morning to take the measurements and gave us a quote the next day. They took care of applying for the builders permit and with the HOA.”
    Kathy Cook C., North Las Vegas · Yelp, December 2022
  • “Ken did a great job and was on time and cleaned up after each time he was at the house. He got our building permits on time and started the next day digging the footings for our patio cover. The patio cover went up in one day and looks fantastic.”
    Brad S., Las Vegas · Yelp, July 2011
  • “The patio has clean attachements to the house, the mated edges and the surrounding flashing. Each day, the crew was quiet, constantly working and cleaned up EVERY bit of debris each working day.”
    Kirk K., Las Vegas · Yelp, December 2020

Process questions

We schedule your free site visit within 24 hours of hearing from you, at a time that suits you.

Yes. The site visit and the written estimate are both free, and the estimate is good for 90 days, so there's no pressure to decide on the spot.

Usually within 72 hours of the site visit, in writing.

We prepare your HOA packet, pull the building permit and handle the engineering through a third-party engineering company. Once those are approved, our own crew builds your cover, usually in 1 to 5 days on site.

Our own crew. We do everything in-house, with no subcontractors, and Ken is available to you throughout the project.

Yes. Cleanup is part of the job, and we finish with a walk-through of the cover with you.

Yes, and yes. We pull the permit on every job and prepare your HOA packet. Engineering is handled through a third-party engineering company.

Approval is up to your HOA, but we make it easy for them to say yes. After you sign, we prepare the packet they ask for: drawings, answers to their common questions and product brochures.

Most projects take 1 to 5 days on site, depending on the size and type of cover. The permit and HOA steps come first, after you sign.

Yes. Clark County requires a permit for every patio cover, so a replacement needs its own permit and has to meet the current code. We pull it on every job.

Get a free estimate for your patio cover

Tell us a little about your patio. We'll call or text within one business day to set up your free site visit.

  • 4.6 stars on Yelp
  • NV Contractor License #0057575
  • 3,500+ jobs since 2004

Your free estimate